Title: A FRAMEWORK BASED REVIEW OF INTERNAL COMMUNICATION IN THE ACTIVATION OF URBAN RAIL EXTENSIONS
Author: Sandhra Pullarkkattu Sageer
Abstract:

An urban rail extension can be physically complete and still unable to carry passengers, because the transition to service runs on a chain of confirmations rather than on construction progress. This review adopts the Antecedents-Decisions-Outcomes framework and reports its process following the SPAR-4-SLR protocol to synthesise evidence on the communication layer of that transition. From 423 records retrieved, screening produced a 34-item shortlist; the review cites 30 studies, 20 of them read in full text, together with four primary agency documents. Antecedents concentrate at the inter-organizational level: dispersed information ownership, configuration sets reaching 155,000 items, and a fixed public opening date that reduces visibility of assurance issues. Decisions divide into mechanisms that make status observable and those that assign responsibility, the strongest reported result being a transition designed as its own organisation at a major airport, with an opening six months ahead of plan. Outcomes expose the principal gap: no study attaches an outcome measure to the confirmation phase itself, although schedule, cost and defect measures exist on either side. The review proposes confirmation latency and resubmission rate as recoverable measures, and argues for treating accessibility criteria, which the literature already quantifies, as readiness conditions rather than service outcomes.

Keywords: internal communication, operational readiness, urban rail, regulatory oversight.
DOI: https://doi.org/10.38193/IJRCMS.2026.8605
PDF Download
Date of Publication: 12-11-2026
Download Publication Certificate: PDF
Published Vol & Issue: Volume 8 Issue 6 November-December 2026